Cutover runsheet template (cutover plan)

Hour-by-hour tasks, owners, verification and actual times. Free download in Excel and PDF.

CM-TPL-CUT-01Cutover phaseExcel and PDFFree
Free download

Download the cutover runsheet template

An hour-by-hour runsheet for a Microsoft 365 tenant-to-tenant cutover weekend, from change freeze to hypercare, with owners, dependencies, verification and actual times.

Free to use and adapt. Document ID CM-TPL-CUT-01, version 1.0, November 2026.

What's inside

What the template includes

Sheet: Runsheet

13 columns, with dropdowns, formulas and 49 example rows:

StepPhasePlanned startDuration (min)TaskOwner roleDependency (step)VerificationStatusActual startActual finishSlip (min)Notes

Document sections

  1. Cutover summary · Two or three sentences: what is moving, from where to where, the window and the expected user impact.
  2. Roles and responsibilities · One named person per role, plus a backup. The cutover manager runs the bridge; the sponsor makes go / no-go decisions.
  3. Timeline at a glance · The milestones from the runsheet. Keep this to one page; the full step list is in the spreadsheet.
  4. Go / no-go points · For each decision point list the criteria that must be true. If a criterion is not met, the default answer is no-go.
  5. Working rules for the weekend · Agree these before the weekend and read them out at the first roll call.
  6. Communications schedule · Which messages go out, to whom and when. Drafts should be approved before the weekend.
  7. Contacts · Fill in before the weekend and test every number. Do not put passwords or secrets in this document.
How to use it

How to use this template

  1. Replace the example dates, domains and owner roles with your own; keep step numbers stable once the runsheet is issued.
  2. Every step needs one owner role and a verification that proves it is done. If you cannot verify it, it is not a step yet.
  3. Rehearse the runsheet in a dry run and use the actual durations to correct the planned durations.
  4. On the weekend, the cutover manager updates Status, Actual start and Actual finish live on the bridge. Slip (min) calculates automatically.
  5. Do not pass a go / no-go step until the decision is recorded in the bridge log with a time.
  6. Use the PDF version as the printed briefing pack for leads and the steering group.
Built to a standard

Ready to share with your steering committee

  • Branded cover or instructions page with document ID and version
  • QR code linking to the latest version, and a Code128 barcode for your document register
  • Document control, approval block and a clear disclaimer
  • Example rows written for real migration projects, which you replace with your own
Use it with

Guides that use this template

How to migrate from AD FS to Microsoft Entra IDHow to migrate Jira and Confluence Server or Data Center to Atlassian CloudHow to migrate from Azure DevOps to GitHubAzure migration: how to move servers, databases and files to AzureHow to migrate cPanel email to Google WorkspaceHow to migrate cPanel email to Microsoft 365How to move a website between cPanel hosts without downtimeHow to migrate SQL Server and MySQL to Amazon RDS and AuroraHow to cut over email DNS without losing mailHow to migrate from Exchange Server to Exchange OnlineHow to migrate from GitLab to GitHubHow to migrate Gmail to Exchange OnlineHow to move Microsoft 365 from GoDaddy to a tenant you controlHow to migrate from Google Workspace to Microsoft 365How to migrate IMAP email to Google WorkspaceHow to migrate IMAP email to Microsoft 365How to move Intune-managed devices to a new tenantHow to move mailboxes between Microsoft 365 tenants with cross-tenant mailbox migrationMicrosoft 365 tenant-to-tenant migration: the complete guideHow to migrate from Microsoft 365 to Google WorkspaceHow to move a custom domain from one Microsoft 365 tenant to anotherHow to move from MYOB to XeroHow to migrate a NAS to Azure FilesHow to migrate OneDrive to another Microsoft 365 tenantHow to migrate from Oracle to PostgreSQLHow to move from QuickBooks to XeroHow to migrate Rackspace Email to Microsoft 365How to migrate between Salesforce and HubSpotHow to migrate SharePoint sites to another Microsoft 365 tenantHow to migrate from Shopify to WooCommerceHow to migrate SQL Server to Azure SQLHow to migrate VMware and physical servers to AWSHow to migrate VMware, Hyper-V and physical servers to AzureHow to migrate from WooCommerce (or Magento) to ShopifyHow to migrate Zoho Mail to Microsoft 365
FAQ

Questions about this template

Is the cutover runsheet template free?

Yes. Download it in Excel and PDF and adapt it for your organisation. No sign-up is needed.

Can I use it in Google Sheets or Google Docs?

Yes. Upload the file to Google Drive and open it with Google Sheets or Docs. Dropdowns and most formulas carry across; check conditional formatting after converting.

Can I remove the Cloud-Migrations branding?

Yes. Replace the logo and footer with your own. Keep the disclaimer in mind: the template is general guidance and needs adapting to your project.

How do I know I have the latest version?

Scan the QR code on the cover or instructions sheet. It opens this page, which always links to the current version.