IT project risk register template (Excel)
Likelihood and impact scoring, heat map, owners, mitigations and status. Free download in Excel.
Download the risk register template
Record, score and manage migration risks with owners, mitigations, triggers and a live heat map.
Free to use and adapt. Document ID CM-TPL-PLN-02, version 1.0, November 2026.
What the template includes
Sheet: Risks
17 columns, with dropdowns, formulas and 15 example rows:
Sheet: Heat map
8 columns, formulas and 5 example rows:
Sheet: Scoring guide
5 columns and 5 example rows:
How to use this template
- Write each risk as cause, event and effect: "Because X, Y may happen, resulting in Z".
- Score likelihood and impact 1-5 using the Scoring guide; the score and rating calculate automatically (15+ High, 8-14 Medium, under 8 Low).
- Every risk needs a named owner, a mitigation (reduce likelihood), a contingency (reduce impact) and an early-warning trigger.
- Review open risks weekly; record residual scores after mitigation and close risks that can no longer occur.
- The Heat map sheet counts open risks per likelihood and impact cell from the Risks sheet; paste it into the steering committee report.
Ready to share with your steering committee
- Branded cover or instructions page with document ID and version
- QR code linking to the latest version, and a Code128 barcode for your document register
- Document control, approval block and a clear disclaimer
- Example rows written for real migration projects, which you replace with your own
Guides that use this template
Questions about this template
Is the risk register template free?
Yes. Download it in Excel and adapt it for your organisation. No sign-up is needed.
Can I use it in Google Sheets or Google Docs?
Yes. Upload the file to Google Drive and open it with Google Sheets or Docs. Dropdowns and most formulas carry across; check conditional formatting after converting.
Can I remove the Cloud-Migrations branding?
Yes. Replace the logo and footer with your own. Keep the disclaimer in mind: the template is general guidance and needs adapting to your project.
How do I know I have the latest version?
Scan the QR code on the cover or instructions sheet. It opens this page, which always links to the current version.