Post-implementation review (PIR) template

Lessons learned and benefits realised. Free download in Word and PDF.

CM-TPL-CLS-03Close phaseWord and PDFFree
Free download

Download the post-implementation review template

Reviews a completed migration against its objectives: what was delivered, how it went, which benefits have been realised and what to do differently.

Free to use and adapt. Document ID CM-TPL-CLS-03, version 1.0, November 2026.

What's inside

What the template includes

Document sections

  1. Review details · Basic facts about the review.
  2. Executive summary · Five or six sentences: overall result, the biggest success, the biggest problem and the top recommendation.
  3. Objectives and outcomes · Take objectives from the business case or charter. Status: Achieved, Partly achieved, Not achieved.
  4. Schedule and cost performance · Compare plan to actual. Express cost as variance percentage and explanation; do not include amounts in this document.
  5. Quality and service impact · Summarise from the hypercare issue log and incident records.
  6. Benefits realised · Each benefit needs a baseline, a measure and an owner who will keep tracking it after the project closes.
  7. What went well · Specific practices worth repeating. Include evidence.
  8. What did not go well · Describe the problem, the impact and the root cause, without blaming people.
  9. Recommendations and actions · Concrete changes, with an owner and date. Add each one to the lessons learned register too.
  10. Approval · Sponsor approval closes the review.
How to use it

How to use this template

  1. Hold the review 4 to 8 weeks after go-live, once hypercare is closed and early benefit data exists.
  2. Gather data first: plan vs actual, hypercare issue log, survey results and the lessons learned register.
  3. Run a facilitated workshop with the project team, operations and business representatives; blame-free.
  4. Write findings as evidence, not opinion, and give every recommendation an owner and a date.
  5. Send the approved review to the steering group and attach it to the project closure report.
Built to a standard

Ready to share with your steering committee

  • Branded cover or instructions page with document ID and version
  • QR code linking to the latest version, and a Code128 barcode for your document register
  • Document control, approval block and a clear disclaimer
  • Example rows written for real migration projects, which you replace with your own
FAQ

Questions about this template

Is the post-implementation review template free?

Yes. Download it in Word and PDF and adapt it for your organisation. No sign-up is needed.

Can I use it in Google Sheets or Google Docs?

Yes. Upload the file to Google Drive and open it with Google Sheets or Docs. Dropdowns and most formulas carry across; check conditional formatting after converting.

Can I remove the Cloud-Migrations branding?

Yes. Replace the logo and footer with your own. Keep the disclaimer in mind: the template is general guidance and needs adapting to your project.

How do I know I have the latest version?

Scan the QR code on the cover or instructions sheet. It opens this page, which always links to the current version.